We are involved on all our technical side in the implementation process of the 5G system on the existing plants of Wind3 in the south, both on ZTE order and on order ERICSSON. The supply chain, now consolidated and appreciated by the customers and the final customer, has been gradually improved in all stages; starting from the initial survey, which we carry out with qualified internal staff, meticulous and attentive to all the details of the plant, through the analysis of administrative pre-existences, up to the structural verification, conducted, where necessary, following innovative principles such as the analysis of shells, and the verification of electromagnetic conformity; it is a truly multidisciplinary study that engages the many mature professionals present in the company. The final product is a permit package adapted to the purpose, which combines the need for plant modification, with an effective feasibility from the point of life structural, environmental, administrative. We do not like to “shoot blanks”, we like to hit the target and ensure the customer the ability to make his investments with timing and in full compliance with the rules. So it works!